2022Years
-
April
Adopted the 3rd angiography equipment
Philips Azurion 7B2015 Bi-plane - June Adopted the 2nd radiation therapy device, Treubeam
-
July
Changed the permission to establish a medical institution(256 rooms 750 beds)
- ICU 2 rooms 48 beds
-General beds 242 rooms 690 beds
- Emergency room 21 beds
(18 general beds, 1 negative pressure bed, 2 general isolation beds)
24 medical departments
2021Years
- April Constructed the Brain Hospital (GFA:11,552.43 m2)